
客户案例:环网柜二次装配线、二次配线生产线与机器人焊接单元
环网柜二次装配线客户案例:将二次装配、配线生产与机器人焊接单元整合,解决前端节拍不稳、焊接质量波动和物料流转不清的问题。

Topic Tag
Articles about Customer Case.

环网柜二次装配线客户案例:将二次装配、配线生产与机器人焊接单元整合,解决前端节拍不稳、焊接质量波动和物料流转不清的问题。

开关柜气箱检测与氦检漏自动化线客户案例:整合机械特性与回路电阻测试、氦检漏、气动平衡吊装、焊接房控制与自动化转运。

A production line case study for bicycle frame e-coating and water decal application, covering e-coat primer, decal application, clear coating and inspection for high-quality finishes.

A conveyorized powder coating line case study for two-wheeler frames, rims and forks, using continuous conveying, automatic powder application and curing for high-volume powder coating.

A power-and-free conveyor coating case study for long elevator trusses, using accumulation and cycle control to optimize the logistics, buffering and space utilization of long-part coating lines.

A painting and coating line case study for motor housings and elevator parts, covering material-specific spraying, color change management and drying curing for electromechanical and elevator component companies.

An e-coating line case study for motor housings, gearbox bodies and water pump parts, focusing on the e-coating of cast iron and aluminum castings with rack design, bath control and film thickness management.

An industrial cleaning and gantry pretreatment line case study for removing oil, rust and oxide before coating, covering tank design, gantry conveying and wastewater treatment.

An e-coating pretreatment line case study for battery pack housings and vehicle body parts, covering pretreatment processes, bath management and workpiece conveying for uniform and stable results.

An e-coating line case study for automotive parts and EV battery components, covering aluminum battery housing e-coating, pretreatment, e-coating, baking and performance testing.

An automatic painting line case study for automotive brake pads and door handles, using rotary table spray machines, masking tooling and parameter control for high-cycle, low-loss batch painting.

A coating line case study for aluminum furniture and plastic parts, covering low-temperature drying, material-specific pretreatment and color change management for mixed metal and plastic production.

A powder coating line case study for outdoor furniture and aluminum products, covering pretreatment, powder coating, curing and weathering performance testing for durable outdoor finishes.

A robotic spray line case study for motors, pumps and industrial parts, using multi-model shared-line spraying, quick-change tooling and parameter recipes for efficient automated coating of medium parts.

A robotic spray coating case study for large workpieces, using spray robots, vision positioning and assisted conveying to improve painting efficiency and consistency.

A painting and coating line case study for tower crane structures, excavator parts and large industrial components, covering large paint booths, electric transfer trolleys, ventilation and workpiece handling.

A system case study for gantry e-coating and powder coating booths for large workpieces, covering gantry conveying, booth structure, powder recovery and color change design.

An integrated surface treatment line case study for cabinets, valves and general metal parts, combining pretreatment, e-coating, spray coating and drying for consistent coating quality and batch consistency.

A planning case study for VCB contact arm, contact and final assembly lines, covering contact arm assembly, conductive circuit connection control, mechanism final assembly and machine commissioning.

A VCB final inspection line that integrates a comprehensive test bench, power frequency withstand voltage testing and loop resistance measurement into the assembly flow, with automatic recording and judgment for consistent batch output.

An integration case study on connecting a running-in (aging) test room and a lifting off-loading machine into the VCB assembly flow, reducing noise, waiting and manual handling.

A layout design case study showing how an RGV transfer system, buffer zones and station-based assembly reduce waiting time and logistics waste in a VCB production line.

A VCB vacuum circuit breaker production line covering chassis truck assembly, vacuum interrupter pole assembly, mechanical characteristic testing and final high-voltage tests, built for consistent and traceable medium-voltage switchgear manufacturing.

A customer case integrating mechanical characteristic and loop resistance testing, helium leak detection, pneumatic balancing lifting, welding room control and automated handling for gas tank manufacturing.

A customer case integrating RMU secondary assembly, wiring production and a robotic welding cell to solve unstable front-end cycle, welding quality variation and unclear material flow.